EN
Unclaimed profileTo claim it, first create an account or log in. Only the person, organization or organisation holding the profile, or someone authorized to represent it, may apply. EkoPulse will review the application.
Claro Arena
Product/Service · Project

Claro Arena

Rehabilitación de estadio · Sustainability Delivered Award 2025

Santiago de Chile, Chile

La transformación del antiguo San Carlos de Apoquindo, diseñada por IDOM, conserva el graderío y gran parte de la estructura de hormigón original. Incorpora una ampliación ligera con madera chilena, protección solar y ventilación natural. El proyecto recibió el Sustainability Delivered Award 2025; las cifras de carbono de la madera publicadas por IDOM no se presentan aquí como balance neto de emisiones del estadio.

1 recorded improvement2 documents

Contribution
29
points accumulated
Level of evidence
C
Support for the information
Formulas and versions

Claro Arena

Approximate location

Chile

Detail of score

The data are calculated with improvements, evidence and connections currently published in EkoPulse.

Model for this calculation: Contribution 2.1 · Level of evidence 1.3.

Contribution: 29 points

Cumulative score

Provisional model: each improvement is assessed according to its significance for this type of profile, from symbolic to transformative. The same work counts once. Contributions are combined with diminishing returns and relevant relationships are added. Evidence adds 0 direct contribution points. The score does not measure tonnes or net impact.

The highest reach levels require human confirmation; until then they receive a conservative rating. New or edited improvements use a provisional level until their current text is reviewed.

1 sustainable improvements (weighed by their reach)+28.5
1 improvements with evidence+0
1 ecosystem connections+0.05
Profile’s own base29
Ecosystem influence+0
Total contribution29

The own base combines practices and direct relationships. Direct relationships and ecosystem influence together add at most 4 points. Ecosystem influence can extend up to 3 steps away and depends on relationship trust and nearby profiles’ data. A disputed relationship transmits no influence through the graph, although it can retain direct credit if its category is eligible. Relationships do not generate negative points.

The advisory thresholds are 25 profiles with improvements, 5 with at least 25 points and at least one reaching 95 points. The current figures are 110, 18 and 71, respectively. Reaching these thresholds does not activate comparison: it requires a model decision.

Level of evidence: C

64 / 100

The model first places the information in a band according to its supporting evidence. It then calculates the score within that band.

Documented, mainly with first-party sources

Applicable band60–69
Coverage: 1 of 1 improvements with evidence
Band baseline60
Practice coverage+2.52
Source diversity+0.72
Documentary support+0.5
Source independence+0
Corroboration+0
Profile information+0.72
Direct relationships+0
Ecosystem support+0
Overall level of evidence64 / 100

Contributions are shown rounded; the total uses the original calculation before final rounding. Ecosystem support is already included and is not added again. Under the current model, the maximum attainable is B+ (84/100).

See the full calculation →

Evolution of the score

The history shows saved snapshots, not a live calculation. Each snapshot retains the model used to calculate it; a model change does not by itself mean the profile’s activity changed.

0102030Contribution · points · left axis · 16/10/2026, 03:00:27 UTC: 5.75Contribution · points · left axis · 21/10/2026, 03:00:27 UTC: 5.75Contribution · points · left axis · 18/11/2026, 03:00:27 UTC: 28.550255075100Level of evidence · out of 100 · right axis · 16/10/2026, 03:00:27 UTC: 64Level of evidence · out of 100 · right axis · 21/10/2026, 03:00:27 UTC: 64Level of evidence · out of 100 · right axis · 18/11/2026, 03:00:27 UTC: 64Updated model · 2.1Updated model · 2.216 Oct 261 Nov 2618 Nov 26

Two different scales; the heights of the curves cannot be compared.

Updated model · Discontinuity indicates a change in methodology.

View snapshots and methodology

Two different scales, the same dates. Only recorded snapshots are shown; earlier scores are not reconstructed.

EkoPulse scores are recalculated as the available information changes and the evaluation model evolves. Methodological improvements may result in changes in the score that do not necessarily reflect an equivalent change in profile performance.

Catch (UTC)ContributionLevel of evidenceModel
16/10/2026, 03:00:275.7564 (C)2.0
21/10/2026, 03:00:275.7564 (C)2.1
18/11/2026, 03:00:2728.5564 (C)2.2

EkoPulse scores are recalculated as the available information changes and the evaluation model evolves. Methodological improvements may result in changes in the score that do not necessarily reflect an equivalent change in profile performance.

Contribution Reference

  • This profile28.55
  • Mean profile Contribution15
  • Top 20%31

Sample: 110 products/services with a public score.

Sustainable improvements

1 recorded improvement

Waste

Illustrative image · AI
Waste
Reutilización de la estructura existente en Claro Arena Added by EkoPulseEl diseño de IDOM conserva el graderío y la estructura principal de hormigón del antiguo estadio, incorporando la ampliación sobre el edificio existente en lugar de sustituirlo por completo.
Metrics

Contribution and level of evidence over time

The history shows saved snapshots, not a live calculation. Each snapshot retains the model used to calculate it; a model change does not by itself mean the profile’s activity changed.

0102030Contribution · points · left axis · 16/10/2026, 03:00:27 UTC: 5.75Contribution · points · left axis · 21/10/2026, 03:00:27 UTC: 5.75Contribution · points · left axis · 18/11/2026, 03:00:27 UTC: 28.550255075100Level of evidence · out of 100 · right axis · 16/10/2026, 03:00:27 UTC: 64Level of evidence · out of 100 · right axis · 21/10/2026, 03:00:27 UTC: 64Level of evidence · out of 100 · right axis · 18/11/2026, 03:00:27 UTC: 64Updated model · 2.1Updated model · 2.216 Oct 261 Nov 2618 Nov 26

Two different scales; the heights of the curves cannot be compared.

Updated model · Discontinuity indicates a change in methodology.

View snapshots and methodology

Two different scales, the same dates. Only recorded snapshots are shown; earlier scores are not reconstructed.

EkoPulse scores are recalculated as the available information changes and the evaluation model evolves. Methodological improvements may result in changes in the score that do not necessarily reflect an equivalent change in profile performance.

The milestones distinguish the beginning of an action and its registration in EkoPulse. They do not automatically attribute a punctuation change to that action.

Catch (UTC)ContributionLevel of evidenceModel
16/10/2026, 03:00:275.7564 (C)2.0
21/10/2026, 03:00:275.7564 (C)2.1
18/11/2026, 03:00:2728.5564 (C)2.2

Consumption and other measurements

No public measurements are available for this profile yet.

Frameworks and recognitions

Sustainability Delivered Award 2025

Recorded recognition

The Stadium Business Design & Development Awards

Connected ecosystem
IDOM
IDOM
Organization · Ingeniería y arquitectura para edificios sostenibles, energías renovables y economía circular.
Proyecto con participación de IDOM
Imported from external sources

Papel de IDOM: Diseño arquitectónico de la transformación del estadio. Fuente: https://www.idom.com/proyecto/estadio-san-carlos-de-apoquindo/. La conexión no implica propiedad ni operación del activo.

Do you know information about this profile?

Any registered person can provide information. There is no need to represent this organization or be verified.

Contribute information

Transparency and provenancei

Official information0
Community0
References in this section0

This count covers references added in this section; it excludes documents and evidence in other sections of the profile.

There are no posts or references in this section yet.